Rework Effort %

Rework Effort  metric is the ratio of Total Effort for Rework to Total Effort for Project. This metric is used to monitor the percentage effort spend on rework activities is kept as minimum as possible. This metric helps to derive the actual value of rework activities performed for project. It is measured in percentage (%) figure.

Rework Effort is calculated at overall project level. 

How to calculate Rework Effort %:

Total Effort for Rework
Total Effort for Project
Rework Effort %
25 PD
500 PD
5

Rework Effort % = (Total Effort for Rework / Total Effort for Project) * 100
                                 = 25 / 500 *100
                                 = 5 %